SVC-B · engineering specification

Amatic Game-Floor Engineering Services

Configuration control for power, networks, payment systems, approval files, and service readiness.

Service tier / technical output

Service tierDocumented output
Network integrationManaged Ethernet topology, VLAN-isolated audit traffic, port schedule, offline-state test.
Firmware controlSigned image register, staged OTA procedure, release log, and rollback verification.
Coin-op auditValidator event path, meter reconciliation, access roles, and GLI-19 scope cross-reference where applicable.
Site engineeringCabinet footprint, circuit schedule, thermal clearance, anchoring, aisle, and service-access plan.

Four-stage acceptance path

  1. 1. Bench configurationRecord cabinet build, peripherals, firmware hash, payment method, and destination.
  2. 2. Approval mappingIdentify required laboratory, regulator, operator, and local electrical evidence before shipment.
  3. 3. 72-hour burn-inExercise network loss, restart, validator, door event, thermal state, and log export.
  4. 4. Operator baselineSign off meter values, access roles, maintenance intervals, spares, and escalation contacts.

Request the engineering document index

Documentation availability depends on model, configuration, and jurisdiction.